Epoxy Flooring in South Jordan, UT
Salt Lake City Superior Epoxy Flooring provides professional epoxy flooring in South Jordan, UT. We install garage floor epoxy, full-broadcast flake, one-day polyaspartic floors, basement floor epoxy, metallic epoxy, polished concrete and patio coatings, and we repair failed coatings. Every floor starts with diamond grinding to ICRI CSP 2-3 and a moisture check wherever the slab calls for one.
South Jordan has grown from a farm town into one of the valley's busiest suburbs, with an estimated 88,910 people in 2025. A lot of that growth is new construction, and that changes what we look for before we coat a floor here.
Free Estimate in South Jordan
Or call (385) 622-8922
Coating New Slabs in Daybreak and Other New Builds
Daybreak, the master-planned community Kennecott Land started in 2004, covers about 4,200 acres on the city's west side and is planned for more than 20,000 homes. Plenty of garages there, and across the newer parts of South Jordan, are bare concrete only a few years old.
New slabs worry us more than old ones. Concrete gives off moisture as it dries, and a slab poured last year may still be moving a lot of vapor. Coat it too soon and the film can blister from below.
So we test new slabs too, not just basements. An ASTM F2170 RH test reads after 24 hours, and an ASTM F1869 calcium chloride test sits 60 to 72 hours. Over 80% RH or 3 lbs, we either use the moisture-mitigating primer or tell you to wait a season.
When the slab is ready, most new-build owners pick a full-broadcast flake floor with a polyaspartic topcoat. It runs $5.50 to $8 per sq ft, and a three-car garage of about 700 sq ft lands at $3,850 to $5,600.
Lake Bonneville Ground and South Jordan Basements
South Jordan is flat for a reason. It sits on lake sediments left by Lake Bonneville, which filled the valley during the last ice age, and the ground rises gently from about 4,300 feet at the Jordan River to 5,200 feet at the Oquirrh foothills.
Basements are standard in valley homes, and South Jordan is no exception. Before we coat one, we run a free moisture test, because vapor moving up through a below-grade slab is the main reason basement coatings bubble.
Basement floors over the mitigating primer carry a 10-year warranty against peeling, bubbling and delamination. A basement of about 800 sq ft runs $4,000 to $6,800, plus $1,200 to $2,400 when the primer is needed.
Families finishing a basement for a playroom or home gym often go flake for grip and easy cleaning. Theater rooms and bars lean toward metallic epoxy at $9 to $14 per sq ft.
Floors We Coat Around South Jordan



Patios, Porches and Commercial Floors in South Jordan
Back patios and covered porches on newer South Jordan homes take full afternoon sun. Plain epoxy ambers outdoors, so we use a textured polyaspartic system with aluminum oxide grit or flake at $6 to $9.50 per sq ft.
Outdoor jobs run April through October, on a dry slab with no rain forecast for 24 hours, and carry a 5-year warranty. A patio that's heaving or ponding water needs a concrete contractor first, and we'll tell you so.
With Downtown Daybreak and its ballpark opening in 2025, the city's commercial floor space is growing too. Our commercial crew installs quartz, urethane cement and polished concrete here and in West Jordan, UT, on nights and weekends at no surcharge.
Our South Jordan Floor Process
We call back within 2 business hours, visit within 3 business days and email an itemized quote the same day. Moisture tests are free on every basement and slab-on-grade quote.
Install day means diamond grinding on HEPA extraction, crack and spall repair ground flush, base coat, flake broadcast to rejection and a clear polyaspartic topcoat. Stem walls up to 12 inches tall are included.
We've coated 4,600+ floors throughout the Salt Lake Valley since 2006. We're licensed through the Utah Division of Professional Licensing (DOPL) and insured.
Closing on a new home and want the garage done before the moving truck shows up? Ask about the rush slot. Each crew holds 1 a week, and a one-day polyaspartic floor lets you park 24 hours after we pack up, as long as the slab tests dry enough to coat.
South Jordan Epoxy Floor Questions
How long should I wait to coat a brand-new garage slab?
The slab determines the schedule, not the calendar, so we test it first. If an ASTM F2170 RH test shows over 80%, we use a moisture-mitigating primer or wait until the slab dries out.
Do you coat garage floors in Daybreak?
Yes. Newer Daybreak slabs get a moisture test first, and most owners there pick full-broadcast flake under a polyaspartic topcoat.
Can you coat my back patio in South Jordan?
Yes, with a textured polyaspartic system that won't yellow in sun. We schedule outdoor work April through October, and patio coatings carry a 5-year warranty.
How much more is a three-car garage than a two-car?
A three-car garage of about 700 sq ft runs $3,850 to $5,600 as a flake system. A two-car of about 450 sq ft runs $2,500 to $3,600.
Do you install commercial floors in South Jordan?
Yes. Quartz broadcast epoxy for restrooms and clinics, urethane cement for kitchens and polished concrete for retail, installed on nights and weekends at no surcharge.
Schedule a South Jordan Floor Estimate
Call (385) 622-8922 or use the form above. Once you sign, we're usually on site within 7 to 14 days.
